Linear Programming and Optimization: Difficult Problems with Solutions

Problem 1
Using the geometric interpretation of the linear programming problem, find the values of the parameter [tex]a[/tex] for which the problem [tex]\max\ z=2x_1+x_2[/tex] subject to [tex]x_1-2x_2\le 4[/tex], [tex]x_1-x_2\le 6[/tex], [tex]x_1+ax_2\le 3[/tex], [tex]x_1\ge 0,\ x_2\ge 0[/tex] has a solution (i.e. [tex]z[/tex] attains a greatest value on the feasible set).
Problem 2
The costs of a company are described by the objective function [tex]F=x_2-3x_3-2x_5+14.76[/tex]. The constraints arising from the production capacities are [tex]x_1+3x_2-x_3+2x_5=7[/tex], [tex]-2x_2+4x_3+x_4=12[/tex], [tex]-4x_2+3x_3+8x_5+x_6=10[/tex], [tex]x_i\ge 0,\ i=1,2,\ldots,6[/tex]. Using the tableau form of the simplex method with the initial basis [tex]x_1, x_4, x_6[/tex], find the minimum value of the costs [tex]F[/tex].
Problem 3
Find the least value of the function [tex]z=5x_1+x_2+2x_3+4x_4+3x_5+20x_6[/tex] subject to the constraints [tex]x_3-2x_4+x_6=3[/tex], [tex]x_2-x_4+2x_6=18[/tex], [tex]-3x_4+x_5+x_6=12[/tex], [tex]x_1+3x_6=13[/tex], [tex]x_j\ge 0,\ j=1,2,\ldots,6[/tex].
Problem 4
Three warehouses [tex]A_1, A_2, A_3[/tex] have [tex]20[/tex], [tex]10[/tex] and [tex]15[/tex] tons of goods, respectively, and four consumers [tex]B_1, B_2, B_3, B_4[/tex] need [tex]15[/tex], [tex]20[/tex], [tex]15[/tex] and [tex]10[/tex] tons, respectively. The transportation costs (in dollars per ton) are given by the matrix [tex]C=\begin{bmatrix}2&1&4&6\\4&6&3&2\\6&4&5&3\end{bmatrix}[/tex], where row [tex]i[/tex] corresponds to warehouse [tex]A_i[/tex] and column [tex]j[/tex] to consumer [tex]B_j[/tex]. All the available goods must be shipped, and no consumer may receive more than it needs. Find the minimum total transportation cost (in dollars).
Problem 5
Four workers must be assigned to four machines [tex]A, B, C, D[/tex], one worker per machine. The time (in minutes) that worker [tex]i[/tex] needs to complete the task on each of the machines is given by the matrix [tex]\begin{bmatrix}70&80&75&64\\55&52&58&54\\58&56&64&68\\62&60&67&70\end{bmatrix}[/tex] (row [tex]i[/tex] corresponds to worker [tex]i[/tex], and the columns to the machines [tex]A, B, C, D[/tex]). Find the minimum total working time (in minutes) under an optimal assignment.
Correct:
Wrong:
Unsolved problems:
Suggest a problem on this page

Feedback   Contact email:
Follow us on   X   Facebook

Copyright © 2005 - 2026.