Work Problems - Working Together: Problems with Solutions

Work problems solved with rates, fractions and equations: two or more people, machines or pipes working together, filling and draining a pool at the same time, one starts and another finishes, changed productivity, and finding how long each would take alone.
Problem 1
A pool in a sports complex can be filled by one pipe in [tex]12[/tex] hours and by another in [tex]8[/tex] hours. How long will it take to fill the pool if water flows through both pipes at the same time?
Problem 2
Karlsson and the Kid can eat a plate of meatballs together in [tex]6[/tex] minutes. Karlsson alone eats the same plate in [tex]8[/tex] minutes. How many minutes does it take the Kid to eat it alone?
Problem 3
Grandpa can do a job in [tex]30[/tex] minutes, Grandma in [tex]40[/tex] minutes, and their granddaughter in [tex]24[/tex] minutes. How many minutes will it take the three of them working together?
Problem 4
A pool is filled by two pipes in [tex]2[/tex] hours. One pipe fills it twice as fast as the other. How long would each pipe take to fill the pool alone?
Problem 5
One coffee machine makes [tex]15[/tex] cups of coffee in [tex]2[/tex] minutes, and another makes [tex]20[/tex] cups in [tex]3[/tex] minutes. How many minutes will it take the two machines together to make [tex]255[/tex] cups?
Problem 6
One tractor can plough a field in [tex]8[/tex] hours and another in [tex]6[/tex] hours. The two tractors ploughed together for [tex]2[/tex] hours. How many hours will a third tractor, which can plough the whole field alone in [tex]12[/tex] hours, need to plough the rest of the field?
Problem 7
A bathtub has two taps. One tap fills it in [tex]12[/tex] minutes, and the other [tex]3[/tex] minutes faster. How many minutes will it take the two taps together to fill [tex]\frac{7}{9}[/tex] of the bathtub?
Problem 8
A bathtub fills in [tex]8[/tex] minutes, and it takes [tex]10[/tex] minutes for the water to drain out. How many minutes will it take to fill the bathtub if the drain is left open?
Problem 9
A worker can do a job in [tex]10[/tex] days. If another worker helps him for [tex]2[/tex] days, the job is done in [tex]6[/tex] days. How many days would the second worker need to do the job alone?
Problem 10
Greg and Mike peeled potatoes. Greg peeled [tex]2[/tex] potatoes a minute and Mike [tex]3[/tex] potatoes a minute. Together they peeled [tex]400[/tex] potatoes. How many minutes did Mike work if he worked [tex]25[/tex] minutes longer than Greg?

Problem 11
Two snowplows must clear a stretch of road. The first can clear it alone in [tex]2[/tex] hours and the second in [tex]1[/tex] hour [tex]30[/tex] minutes. They worked together for [tex]20[/tex] minutes, and then the first one broke down. How many minutes did the second snowplow need to finish the job alone?
Correct:
Wrong:
Unsolved problems:
Suggest a problem on this page

Feedback   Contact email:
Follow us on   Twitter   Facebook

Copyright © 2005 - 2026.