Work Problems - Working Together: Difficult Problems with Solutions

Problem 1
One worker can do a job in [tex]8[/tex] days and another in [tex]12[/tex] days. They started at the same time and worked together for several days, and then the second worker was moved to another job. The first worker finished the rest of the job in [tex]3[/tex] days. How many days did the first worker work?
Problem 2
Two workers with equal productivity can complete an order together in [tex]5[/tex] hours. Before starting, one of them increased his productivity by [tex]40\%[/tex]. How long will it take them to complete the order?
Problem 3
A worker completes his daily quota in [tex]8[/tex] hours. One day, after working for some time, he found out that he had to leave early, so he doubled his speed and worked that way for as long again, which completed the quota. How much earlier did he leave?
Problem 4
A team of [tex]6[/tex] workers can renovate a building in [tex]45[/tex] hours. The team started work, and after some time [tex]3[/tex] more workers joined. When the job was finished, it turned out that the three had worked for half of the total time. How many hours did the renovation take? (All workers are equally productive.)
Problem 5
A job was to be done in [tex]10[/tex] days by [tex]30[/tex] workers with equal productivity. Three days after the start, [tex]5[/tex] of them left, and the rest increased their daily output by [tex]40\%[/tex] to finish the whole job. On which day was the job finished?
Problem 6
In [tex]2[/tex] hours Tom can paint [tex]75\%[/tex] of a fence, and in the same time Huck can paint [tex]60\%[/tex] of it. Tom painted [tex]10\%[/tex] of the fence alone, and then Huck joined him. How long did it take to paint the whole fence?
Problem 7
A pool is filled by three pipes. The first and second together fill it in [tex]20[/tex] hours, the second and third in [tex]28[/tex] hours, and the first and third in [tex]35[/tex] hours. How long will it take the three pipes together to fill the pool?
Problem 8
One tractor can plough a field in [tex]8[/tex] hours, and another can plough a field of the same size in [tex]10[/tex] hours. The first tractor started ploughing its field at [tex]6{:}00[/tex], and the second started ploughing the other field at [tex]7{:}00[/tex]. At what time will the unploughed part of the second field be twice the unploughed part of the first?
Problem 9
To build a pumping station, a company must dig a trench. It has two excavators: the first can dig the trench alone in [tex]2[/tex] hours, and the second in [tex]3[/tex] hours [tex]20[/tex] minutes. In one hour the first excavator digs [tex]24[/tex] cubic yards of earth more than the second. How many cubic yards of earth must be dug out?
Problem 10
An empty pool can be filled by one pipe in [tex]9[/tex] hours and emptied by another in [tex]15[/tex] hours. The first pipe was opened, and an hour later the second one was opened too. After some time the pool was half full. How long had the first pipe been open?

Problem 11
Two typists can type a text together in [tex]6[/tex] hours. If the first works alone for [tex]10[/tex] hours, the two of them can then finish the job together in [tex]2[/tex] hours. How many hours would each typist (the first and the second) need to type the text alone?
Problem 12
A team of workers did a job in a certain number of days. With [tex]3[/tex] more workers they would have finished [tex]2[/tex] days earlier, and with [tex]12[/tex] more workers, [tex]5[/tex] days earlier. How many workers were in the team, and in how many days did they do the job? (All workers are equally productive.)
Problem 13
A pool is filled by two taps together in [tex]12[/tex] hours. Once, half of the pool was filled by one tap only and then the other half by the other tap only, which took [tex]25[/tex] hours in total. How many hours does each tap need to fill the pool alone?
Problem 14
A team began repairing a building. After [tex]4[/tex] days a second team joined, and [tex]6[/tex] days later the repair was finished. How many days would each team need to do the repair alone if the second team needs [tex]3[/tex] days more than the first?
Problem 15
A pool is filled by two pipes in [tex]3[/tex] hours [tex]44[/tex] minutes. One pipe alone can fill it [tex]1[/tex] hour faster than the other. How long does each pipe need to fill the pool alone?
Correct:
Wrong:
Unsolved problems:
Suggest a problem on this page

Feedback   Contact email:
Follow us on   Twitter   Facebook