Difficult

Work Problems - Working Together: Very Difficult Problems with Solutions

Problem 1
One pipe can fill a pool [tex]4[/tex] hours faster than another. In the time it takes the first pipe to fill half of the pool, the two pipes together would fill the same part of the pool that the second pipe alone fills in [tex]10[/tex] hours. How long does each pipe need to fill the pool alone?
Problem 2
Two machines together can pave [tex]\frac{2}{3}[/tex] of a street in [tex]2[/tex] h [tex]24[/tex] min. The productivity of the second machine is [tex]33\frac{1}{3}\%[/tex] lower than that of the first. After the first machine had paved half of the street, the second machine joined it. At what time had the first machine paved [tex]6[/tex] times as much as the second, if the work began at [tex]8{:}00[/tex]?
Problem 3
An empty pool is filled by one pipe in [tex]5[/tex] hours and by a second pipe in [tex]12[/tex] h [tex]30[/tex] min, and a third pipe empties it in [tex]6[/tex] h [tex]40[/tex] min. The first two pipes worked together for some time; then the first was closed and the second worked alone for [tex]5[/tex] more hours, after which [tex]68\%[/tex] of the pool was full. Then the second pipe was closed and the third was opened. How many minutes after the first two pipes were opened will the water in the pool be [tex]50\%[/tex] of its volume?
Problem 4
Because of a hole, a compartment of a ship was flooding. [tex]10[/tex] sailors can pump the water out in [tex]6[/tex] hours, and [tex]14[/tex] sailors in [tex]4[/tex] hours. How many hours will it take [tex]18[/tex] sailors to pump it out? (Water keeps coming in through the hole at a constant rate, and all sailors pump equally fast.)
Problem 5
Two teams working together can do a job in [tex]12[/tex] days. The slower team can do [tex]\frac{75}{7}\%[/tex] of the whole job in [tex]6[/tex] days fewer than the faster team needs to do [tex]\frac{3}{7}[/tex] of the job. How many days would each team (the slower and the faster) need to do the whole job alone?
Problem 6
Two workers worked for the same length of time, each at his own constant rate, and made [tex]12[/tex] parts together. If both had worked at the first worker's rate, they would have needed [tex]12[/tex] minutes less to make [tex]12[/tex] parts; at the second worker's rate, they would have needed [tex]20[/tex] minutes more. How many parts does each worker (the first and the second) make in an [tex]8[/tex]-hour working day?
Problem 7
A team of mowers had to mow two meadows, one twice as large as the other. For half a day the whole team mowed the large meadow. Then half of the team moved to the small meadow, and both halves mowed until evening. By evening the large meadow was finished, and the part of the small meadow left unmowed could be mowed by one mower in one day. How many mowers were in the team? (A problem of Leo Tolstoy.)
Problem 8
Several workers with equal productivity can do a job together in [tex]24[/tex] days. Instead, they started one after another at equal time intervals, and each worked until the job was finished; the first worked [tex]5[/tex] times as long as the last. How many days did the job take?
Correct:
Wrong:
Unsolved problems:
Difficult
Suggest a problem on this page

Feedback   Contact email:
Follow us on   Twitter   Facebook

Copyright © 2005 - 2026.